How Long Does a New Roof Installation Take in the DFW Area? A Timeline
Planning a roof replacement? Learn the realistic timeline for new roof installation in the DFW area and what to expect during each phase of the process.

How Long Does a New Roof Take? A DFW Homeowner’s Timeline
So, you’ve decided to invest in a new roof. You’ve chosen the material, picked the color, and signed the contract. Now comes the big question: How long will my life be disrupted? For many homeowners in the Dallas-Fort Worth area, the thought of a major construction project can be daunting. You might be imagining weeks of noise, mess, and inconvenience.
The good news is that, for a professional roofing crew, a full roof replacement is a surprisingly fast and efficient process. While every project is unique, we can provide a realistic timeline so you know exactly what to expect when the Good Work Roofing team arrives at your home.
Key Factors That Influence the Timeline
For an average-sized single-family home in a DFW suburb like McKinney or Plano (around 2,000-3,000 sq. ft.), a standard asphalt shingle roof replacement typically takes 1 to 3 days.
However, several factors can affect this timeline:
- Size and Complexity of the Roof: A simple, single-story gable roof will be much faster than a large, multi-story home with numerous peaks, valleys, dormers, and steep pitches.
- The Roofing Material: Lightweight asphalt shingles are the fastest to install. Heavy materials like concrete tile or custom metal work can take longer.
- The Weather: This is the biggest variable in North Texas. Roofing cannot be done safely in the rain, or in dangerously high heat or wind. We will only work when conditions are safe for our crew and for the proper installation of your roof.
- Extent of Underlying Damage: Sometimes, when we tear off the old roof, we discover hidden damage to the wooden decking underneath, such as water rot. Repairing this decking is essential and will add time to the project.
The Day-by-Day Breakdown of a Typical Roof Replacement
Here’s what you can expect during the installation process.
Day 0: Preparation and Material Delivery
Before the installation crew arrives, our team will handle the prep work. This includes:
- Permitting: We handle pulling all necessary permits with your city.
- Material Delivery: Shingles, underlayment, and other materials will be delivered to your home, usually placed carefully in your driveway or on the roof itself by a conveyor truck. This typically happens the day before the project starts.
- Homeowner Prep: We’ll ask you to clear your driveway, move cars to the street, and protect any sensitive plants or patio furniture near the house. It’s also a good idea to take any pictures or wall hangings off exterior walls, as vibrations can cause them to fall.
Day 1: The Main Event - Tear-Off and Installation
This is the loudest and busiest day.
- Morning (Arrival & Tear-Off): Our crew will arrive early. The first step is to protect your property. We lay down tarps to cover your landscaping, siding, and A/C units. Then, we begin the tear-off, systematically removing all the old roofing materials down to the wooden decking.
- Mid-Day (Decking Inspection & Dry-In): With the decking exposed, we conduct a thorough inspection for any soft or rotted wood and make necessary repairs. Once the deck is solid, we install the new underlayment (felt paper or synthetic barrier) and drip edge. This step, known as “drying in,” makes your home watertight.
- Afternoon (Installation): We begin laying the new shingles, starting from the bottom and working our way up. Our crews work efficiently and systematically to ensure every shingle is placed and nailed according to manufacturer specifications.
Day 2 (and possibly 3): Finishing Touches and Meticulous Cleanup
For most average-sized homes, we may be finishing the shingle installation on the morning of Day 2. The rest of the day is dedicated to the details.
- Detail Work: We install ridge capping, vents, and flashing around chimneys and pipes, ensuring every potential entry point for water is sealed.
- The Cleanup: This is a step we take very seriously. We will clean out your gutters, clear all debris from your property, and go over your entire yard with powerful magnetic rollers to pick up stray nails. Our goal is to leave your property cleaner than when we arrived.
- Final Inspection: A project manager will perform a final walk-through with you to ensure you are 100% satisfied with the work.
Your Partner for an Efficient DFW Roof Replacement
At Good Work Roofing, we understand that a roof replacement is a major undertaking. Our entire process is designed to be as efficient, clean, and minimally disruptive as possible for you and your family. We pride ourselves on clear communication, so you’ll know the schedule every step of the way.
Ready to learn more about our seamless roof installation process?
Contact Good Work Roofing today for a free, no-obligation estimate. We’ll provide you with a detailed proposal and a clear timeline for your specific project.